Top
image credit: Adobe Stock

Entergy approved to build 1.2 GW CCGT plant that will run on hydrogen, gas

November 28, 2022

The Public Utility Commission of Texas approved Entergy’s proposal to build the Orange County Advanced Power Station, a 1,215 MW combined cycle plant that will be located near Bridge City.

Located in one of the largest industrial regions in the country, the plant would have the initial capability to use up to 30% hydrogen by volume along with natural gas to generate power.

Read More on Power Engineering