When a town has high electric bills and no available land for a solar farm, a floating solar plant on the pond of a waste water plant makes great sense. Walden, Colorado, population 750, elevation 8,000 feet plus, and land area of 0.34 square miles, is such a town.
“We were spending about $22,000 a month for electricity for the water treatment facility, and this 75 kW solar installation will save us $10,000 a month,” says Jim Dustin, mayor of Walden, Colo. “We’ll pay for the plant in 20 years, and it is still expected to run 10 more years after that,” he says.