Top
image credit: Pixabay

Ørsted completes US solar and battery storage facility

May 5, 2021

Ørsted has completed its Permian Energy Center project, a 460 MWAC hybrid solar and battery storage facility located in Andrews County, Texas, US.

Permian Energy Center brings Ørsted’s onshore operating capacity to 2.1 GW. The project and its 420 MWAC of solar photovoltaics (PV) and 40 MWAC of battery storage will be located on a 3600-acre site alongside existing oil and gas installations and will supply growing West Texas demand for electricity.

Read More on Energy Global