Top
image credit: Unsplash

Intersect Power reaches commercial operation of 310 MW solar+storage project in California

Intersect Power has reached commercial operation on its Athos III solar project in Riverside County, California.

The Athos III solar project (also known as Blythe Mesa Solar II) generates 224 MWac/310 MWp of reliable solar energy, enough to power approximately 94,000 homes, and features 448 MWh of co-located battery storage.

The Athos III solar project was built by union labor, with American-made solar panels, batteries, and steel piles, meaning it is expected to meet the domestic content and prevailing wage requirements in the Inflation Reduction Act.

Read More on Renewable Energy World