Top
image credit: Pexels

GE reveals new parts for the ‘world’s largest offshore wind turbine’

GE Renewable Energy, a subsidiary of General Electric based in Paris, revealed “the first manufactured components” for its gigantic Haliade-X 12 megawatt (MW) offshore wind turbine.

On Monday, the firm displayed the first nacelle for the turbine, which will now be shipped from Saint-Nazaire in France to Rotterdam-Maasvlakte in the Netherlands. A nacelle sits directly behind a turbine’s blades and is a shell-like structure that contains crucial pieces of kit. These include the turbine’s gearbox, controller, generator and brake.

Read More on CNBC energy