Top
image credit: Adobe Stock

Jupiter Power 200 MW/200 MWh battery storage facility now online in Texas

July 5, 2022

Jupiter Power’s 200 MW/200 MWh standalone battery storage facility is now commercially operable.

Crossett Power Management, located in Crane County, Texas, now becomes one of the largest battery storage projects in ERCOT, the grid operator representing 90 percent of the state’s electric load.

Crossett is Jupiter’s second transmission-connected project to begin operations, joining Flower Valley II, a 100MW/200MWh storage facility in Reeves County, Texas.

Read More on Renewable Energy World