Top

Davis-Besse Nuclear Plant Down for Refueling & Replacement Project

March 29, 2016

FirstEnergy Nuclear Operating Co. (FENOC), a subsidiary of FirstEnergy Corp. (NYSE: FE), shut down the 908-MW Davis-Besse Nuclear Power Station in Ohio for a scheduled refueling and maintenance outage.

While the unit is down, about a third of the reactor’s 177 fuel assemblies will be replaced.

Read More on Power Engineering