Top
image credit: Unsplash

Pattern Energy to repower Gulf Wind facility in Texas

January 17, 2020

Repowering the Gulf Wind facility will consist of removing the current wind turbines and replacing them with 118 new Siemens Gamesa SWT-2.3-108 turbines, which have 108m blades on 80m towers. The new wind turbines will generate 271 MW of capacity.

The Gulf Wind facility has entered into a new 20-year power purchase agreement with Austin Energy for the majority of the facility’s energy production. The remaining output will be sold at merchant power prices. Gulf Wind is strategically located on the Gulf Coast in Kenedy County, Texas, where favourable wind conditions allow the facility to maximise energy production during times of peak demand and peak pricing.

Read More on Energy Global